Narrowboat Surveys Ltd

Narrowboat Surveys Ltd

Paul Smith MEng, Dip Mar Sur, MIIMS

Links

The Boat Safety Scheme
The Recreational Craft Directive (RCD)
Yacht Designers and Surveyors Association
International Institute of Marine Surveying

RCD Page 3

RCD Page 1


Part-completed or ‘kit’ boats require a Declaration of Conformity to Annex IIIa from the builder (Declaration details as above), but it should list only the ERs which have been met at the point of sale and how they have been met. A statement that the vessel was sold as requiring completion by others must be included. The vessel cannot be CE marked at this stage. However, when the boat is completed and can be shown to meet all the ERs, it may be CE marked.